Irvine Campus Solar Project
Capital Group Companies first hired EcoMotion in 2009 to support a solar project at its Irvine, California campus. EcoMotion helped the companies get the largest possible solar system, tying the output of three major arrays to the campus’s most expensive power meter. The result was a 1 MW solar system that was Orange County’s largest at the time. The system covered three parking garage’s shade structures and achieved a 4.1-year payback.
In 2015, EcoMotion was back “on campus” in Irvine when the Southern California Edison rules changed, allowing EcoMotion to help Capital Group boost the solar system capacity from 1.2 MW to 2.8 MW. The additional 1.6 MW was installed on six major rooftops and a fourth parking structure. The combined systems now generate over 4 million kWh annually. EcoMotion’s work included a video production using quality drone footage.
In 2023, EcoMotion team supported the Capital Group Companies in both the maintenance of Phase 1, identifying a suitable provider, and then working with CGC’s Phase 2 solar maintenance provider. Work was also recently done supporting system measurement requirements and performance monitoring.
San Antonio, Texas Solar Project
In 2010 Capital Group Companies retained EcoMotion to explore and become eligible for a new feed-in tariff program in San Antonio, Texas for its facilities there. EcoMotion developed a feasibility analysis, drafted an RFP, and managed a competitive solicitation. Our team even camped in a parking lot to be first in line for limited availability of Central Public Service’s Feed-in Tariff program. After considerable analysis, and legal definitions from Central Public Service, the project was put on hold due to an unusual Bear County tax provision for exported power. In September 2023, a solar system was successfully installed and celebrated there.